Terminal T5 at the Port of Gdansk officially opened for business at the end of October 2026. We had a fantastic opportunity to showcase our capabilities and equipment during this investment, for which NDI was the general contractor. Dredging work was carried out at depths as deep as -17.5 meters, and during the most intense periods, three suction dredgers operated simultaneously on site: CZSZ-LUNDI, CZSZ-TROLL, and Tinganes – a vessel from the Faroe Islands supporting the Red Shkwal fleet. The scows CZSZ-CZERWONY SZKWAŁ and CZSZ-03 also participated in the project. The tugboat Karol, equipped with a harrow with a water jet system, also played an invaluable role, enabling precise seabed leveling. This was an excellent opportunity for us to showcase the potential of our fleet, experience, and commitment to such a demanding project.

Photo: Press materials, NDI Group.