Construction of protective breakwaters for the Outer Harbour in the Port of Gdynia

Execution information

1/49

The first box was placed in position.

After the dredging work was completed, the geotextile was laid, and the crushed stone layer was prepared with a 10 cm tolerance, it was time to install the box and conduct a final test of the completed scope. We consider the test passed ✅

Gallery